Module 8: Operations, Projects & Implementation
8.6Stakeholder & Change Impact
Work out what a change costs and gives each affected group, how ready they are, and what to do first.
- 45 min to fill in
- You leave with: An impact and readiness table per affected group, a message, messenger and training plan for each, and adoption indicators to watch.
- Good for: Specialist, Leading change, Leading people
Before a change goes live, write down for each affected group what changes in their day, what they gain and what they lose, then score how ready they are and match the response to the gap. The power-interest grid, force field, leadership and champions tools are in the Optional sections.
Stakeholder theory is well developed but the power-interest grid (attributed to Mendelow) is a practitioner tool that is rarely tested: practice, not research. Research on reactions to change is extensive and strong in parts, but typologies are contested. The 1 to 5 scores on this page are the library's own scale, not validated instruments. Stakeholder groups here are roles or teams, not named individuals.
When to use it
Use it when:
- You are planning a change (new process, system, structure or way of working) that will land on people who did not choose it.
- You want to anticipate objections and choose between communication, training and involvement.
- You lead or advise a project and the sponsor asks "how will people take it?"
Skip it when:
- The project is running and you need to track and move each person's stance: use 8.17 Stakeholder Impact & Support Map.
- You already know the main obstacle and want to weigh forces for and against: use 8.18 Change Barriers & Forces Canvas. For a general stakeholder map, see 3.1 Stakeholder Map.
The idea
Research on change suggests that what looks like resistance is often reasoned ambivalence, a mix of concerns and hopes, rather than obstruction (Piderit, 2000). Early field work indicated that participation shapes how people respond (Coch & French, 1948), a reading later critics question. Readiness, in the research on it, combines belief that the change is needed, confidence the group can carry it out, and positive feelings about it (Rafferty, Jimmieson & Armenakis, 2013). Those are three different gaps, and communication closes a different gap than training does.
That is why this page asks what each group will lose, not only what they gain: named losses turn vague resistance into concrete objections you can work with. It scores need, confidence and feeling separately so the response can match. The limit: the scores are your judgment, so check them with people in the groups before acting on them.
First step: The Change and Who It Lands On
Describe the change in daily-work terms, not project language.
Strong answer: "From 1 March, drivers' shifts are assigned by a planning system from their stated preferences, instead of by the dispatcher by hand. Phased: one depot first." (illustrative)
| Field | Your answer |
|---|---|
| What is changing (process, technology, structure, culture or strategy) | |
| Size and speed (minor, moderate or transformational; big bang, phased or pilot) |
Example
Illustrative example: the company, roles and scores are made up.
A regional bus company in Sweden introduces a planning system that assigns driver shifts from stated preferences. The operations manager works through the page with an HR partner and a union representative.
Section 2: drivers gain a roster known three weeks ahead and lose the informal swaps with the dispatcher; dispatchers lose control over who works when; customer service gains fewer last-minute changes.
Section 3: drivers score need 2, confident 4, positive 2. Dispatchers score need 3, confident 2, positive 1.
Section 4: for drivers the message is about the problem (unpredictable rosters) and comes from a respected driver and the depot manager. Dispatchers get a changed role and training before the drivers do, since they will field the questions.
Section 5: share of drivers who place preferences by the deadline; calls to the dispatcher in week four. Because jobs and working conditions change, the company engages the union before the decision.
Fill it in and keep your answers
This page shows the first step. The whole template is in the MGMT AC app for iPhone, which opens soon. Your answers stay on your own device.
- 2. Impact on Each Group
- 3. Readiness by Group
- 4. Match the Response to the Gap
- 5. Signs of Adoption